Upcoming Project
Marine & Shipping
Marine Container Terminal Restoration
Long Beach, CA
Coming Soon
Complete sandblasting and protective coating restoration of shipping container handling equipment at major Long Beach terminal facility.
Project Challenge
Extensive saltwater corrosion damage requiring specialized marine-grade coating systems. The equipment operates in a harsh marine environment with constant exposure to salt spray and humidity.
Our Solution
Multi-stage surface preparation followed by high-performance marine coating application. Specialized containment and environmental protection measures for port operations.
Services Planned
Industrial Sandblasting
Marine Coatings
Rust Removal
Environmental Containment
Project Scope
- • Complete surface preparation of container handling cranes
- • Rust removal and corrosion treatment
- • Application of multi-coat marine protection system
- • Environmental containment and debris management
- • Quality control and inspection throughout process
Technical Specifications
This project will demonstrate our capability to work in active marine terminals while maintaining operational efficiency and environmental compliance.
- • Surface preparation to SSPC-SP10 standards
- • Multi-coat marine coating system application
- • Environmental monitoring and containment
- • Coordinated scheduling with port operations
Marine Coating Expertise
Specialized solutions for harsh marine environments and active port operations.
